A planned fossil-fuel-powered data center near Frankfurt has been halted due to local citizen protests. The facility, intended to be 400 meters long with a 170-megawatt capacity, was set to consume 300 million cubic meters of natural gas annually, equivalent to a medium-sized city's usage. The project's operation relied on eight heavy gas engines running continuously. AI
排序理由 The article discusses a local protest against a data center, which is not a significant AI industry event.
在 Mastodon — fosstodon.org 阅读 →
AI 生成摘要 · Google Gemini · 来自 1 个来源。 我们如何撰写摘要 →