PulseAugur
EN
LIVE 21:00:12

TeraWulf builds 500 MW AI campus at former coal plant

TeraWulf is developing a 500 MW AI campus on the site of a former coal plant in Buffalo, New York, to address the significant power and cooling demands of modern AI infrastructure. The facility, named Lake Mariner, utilizes advanced liquid cooling systems and modular power solutions, with plans to expand to 750 MW. Tenants include Core42 and Fluidstack, with Fluidstack hosting Google AI workloads. The campus leverages existing water infrastructure and aims for efficient cooling with minimal water consumption. AI

IMPACT Addresses the critical infrastructure needs for scaling AI compute, focusing on power and cooling solutions.

RANK_REASON Development of a large-scale AI data center campus by a specialized company. [lever_c_demoted from significant: ic=1 ai=0.7]

Read on Data Center Knowledge →

AI-generated summary · Google Gemini · from 1 sources. How we write summaries →

TeraWulf builds 500 MW AI campus at former coal plant

How we ranked this

Signal score
0 / 100
Composite score across the factors below. Higher = stronger signal that this story matters right now.
Newsworthiness bucket
Research
Development of a large-scale AI data center campus by a specialized company. [lever_c_demoted from significant: ic=1 ai=0.7]
Source corroboration
Single-source cluster
Only one publisher covered this so far. Single-source stories can still rank when the publisher is high-authority, but they lack cross-source corroboration.
Topics
infra, product
Editorial topic classification. Feeds into how the story surfaces on /topic/<slug> hub pages and into the per-entity coverage mix.
AI-industry relevance
High
Clearly on-topic for AI-industry coverage.
Story freshness
100 days old
Aged out of breaking-news scoring windows; ranking reflects the durable signal from the full source set.

Full methodology in our editorial standards.

COVERAGE [1]

  1. Data Center Knowledge TIER_1 English(EN) · Scarlett Evans ·

    How a Coal Plant in Buffalo Became TeraWulf’s 500 MW AI Campus

    Data Center Knowledge toured the TeraWulf and Schneider Electric campus in Buffalo, N.Y., to see what it takes to power – and cool – the data centers of the future.