Slate Truck has changed its battery supplier from SK On to Gotion, opting for an LFP (lithium iron phosphate) pack manufactured in Illinois instead of an NMC (nickel-manganese-cobalt) pack. This switch is driven by cost reduction and improved domestic supply chain options, allowing Slate to maintain its target price of $24,950 while projecting a range of 205 miles. The LFP chemistry, while cheaper and more durable for frequent charging, results in a slightly lower horsepower output and eliminates the option for a longer-range extended battery pack. AI
IMPACT Minimal impact on the broader AI industry; primarily a product development update for an electric vehicle.
RANK_REASON This is a product update for a specific vehicle model, not a frontier release or significant industry-wide event.
- Christine Barman
- Georgia
- Gotion
- Illinois
- Indiana
- Peter Faricy
- SK On
- United States Department of Commerce
AI-generated summary · Google Gemini · from 1 sources. How we write summaries →