The Airport Authority of Hong Kong International Airport has assumed control of the retail operations for the 11 Skies project from New World Development. This significant shift involves the authority managing 70% of the retail and dining space, with New World's role substantially reduced. The project, a HK$20 billion (US$2.5 billion) development, is nearing the opening of Terminal 2, though only a limited number of establishments were operational during a recent visit. AI
Summary written by gemini-2.5-flash-lite from 1 source. How we write summaries →
RANK_REASON Significant change in operational control of a major retail and entertainment project. [lever_c_demoted from significant: ic=1 ai=0.1]