Data centers may soon be required to pay substantial deposits for their power demands, with a proposed fee ranging from £237,500 to £712,500 per megawatt for new projects. This regulatory measure aims to manage the significant energy requirements of these facilities. Separately, a sequel to the game Wuchang: Fallen Feathers is reportedly in development by a new studio founded by the original director, Xia Siyuan. AI
RANK_REASON The cluster contains two unrelated news items, one about data center regulation and another about a video game sequel, with no overarching theme or connection.
Read on Mastodon — fosstodon.org →
AI-generated summary · Google Gemini · from 2 sources. How we write summaries →