PulseAugur
EN
LIVE 10:57:58

Data centers face new power deposit fees; Wuchang sequel in development

Data centers may soon be required to pay substantial deposits for their power demands, with a proposed fee ranging from £237,500 to £712,500 per megawatt for new projects. This regulatory measure aims to manage the significant energy requirements of these facilities. Separately, a sequel to the game Wuchang: Fallen Feathers is reportedly in development by a new studio founded by the original director, Xia Siyuan. AI

RANK_REASON The cluster contains two unrelated news items, one about data center regulation and another about a video game sequel, with no overarching theme or connection.

Read on Mastodon — fosstodon.org →

AI-generated summary · Google Gemini · from 2 sources. How we write summaries →

Data centers face new power deposit fees; Wuchang sequel in development

COVERAGE [2]

  1. Mastodon — fosstodon.org TIER_1 English(EN) · [email protected] ·

    📰 Data centres could pay hundreds of millions in deposits for power demands The regulator said a fee of between £237,500 to £712,500 per megawatt should be char

    📰 Data centres could pay hundreds of millions in deposits for power demands The regulator said a fee of between £237,500 to £712,500 per megawatt should be charged for upcoming projects. 📰 Source: BBC News 🔗 Link: https://www.bbc.co.uk/news/articles/c9q90q9qnn2o?at_medium=RSS&at_…

  2. Mastodon — fosstodon.org TIER_1 English(EN) · [email protected] ·

    🎮 A sequel to Wuchang: Fallen Feathers is being developed by its director’s new studio Previous reports claimed that Xia Siyuan had been fired from Leenzee earl

    🎮 A sequel to Wuchang: Fallen Feathers is being developed by its director’s new studio Previous reports claimed that Xia Siyuan had been fired from Leenzee earlier this year 📰 Source: VGC 🔗 Link: https://www.videogameschronicle.com/news/a-sequel-to-wuchang-fallen-feathers-is-bein…